Cowlitz Casino

Project Details:

  • Location:
    La Center, WA
  • Client:
    SAK & Associates
  • Additional Details:

    Duration: 2 months

The construction on this gaming facility was rapid and required an alternate method to forming & pouring site cast walls. The construction team chose shotcrete to accelerate the schedule. The complexity of the tall walls combined with difficult geometry made shotcrete an excellent choice.  The project was able to save time, reduce rework of forming system, and eliminate concrete consolidation issues.